-30 %
additional cost reduction through a change of process
Packaging industry
7 days
until the idle machine was back up and running (reduced scope)
Measurement and testing technology
0,2 mm
completely burr-free bores in 904L stainless steel
Conveying and handling technology
3 iterations
to the right PU coating
for the transport shaft

Procurement chain

J&K does not operate its own production. Manufacturing is carried out by qualified network partners.

  1. Review of the technical inquiry

  2. Selection of the manufacturing partner

  3. Coordination of production

  4. Quality assurance

  5. Documentation

  6. Delivery from Germany

More case studies

  • Schematic illustration

    CONVEYING AND HANDLING TECHNOLOGY

    Three iterations to the right coating

    PU-coated transport shaft: from the first iteration to small-batch production in around seven months

    • Aluminum with PU coating
    • Turning
    Read case study
  • Schematic illustration

    PACKAGING INDUSTRY

    A 25-year-old machine, a manufacturer that no longer exists, 17 components

    The original manufacturer no longer exists and the machine was at a standstill. It was back in operation with reduced scope within seven days.

    • Reverse engineering
    • Multiple materials
    Read case study
  • Schematic illustration
    MEASUREMENT AND TESTING

    MEASUREMENT AND TESTING

    A housing with 0.2 mm bores—burr-free, in 904L stainless ste

    Machining and micro EDM met a requirement that no subsequent inspection could have corrected.

    • 904L stainless steel
    • Five-axis machining
    • Micro sink EDM
    Read case study

Planning a similar project?